← Back to home

Uptime commitment

Our public monthly uptime target, how it is measured, what doesn't count against it, and what we do when we miss it.

Last updated
2026-11-18
Status
Draft · not yet in force, pending review by qualified counsel

1Our target

  1. 1.1

    A gateway monthly uptime target of 99.9% or better, per calendar month in Asia/Shanghai — no more than one request in a thousand failing for reasons on our side.

  2. 1.2

    Every capability group is measured against 99.9%. Monthly uptime is computed per capability group (see section 2); if any capability group falls below 99.9%, that month has missed the target.

  3. 1.3

    This is our public target and method of calculation, not a payout commitment. When monthly uptime falls short of the target we publish a review under section 5 explaining why and what we changed; we do not provide compensation, bonus balance or refunds for it, and our liability for availability is as set out under Limitation of liability in the Terms of Service. This applies from 29 October 2026 (Beijing time): no uptime compensation is issued for October 2026 or any later month; compensation already issued remains valid with its expiry date unchanged.

2How uptime is measured

  1. 2.1

    Monthly uptime = successful requests / (successful requests + requests that failed on our side), computed per capability group over all users' real requests.

  2. 2.2

    The data is our users' real requests — we send no probe requests of our own. Every successful call is recorded in usage detail, and every failure in the gateway's refusal log. Real traffic is the densest probe there is, and it measures exactly the availability you get.

  3. 2.3

    "Failed on our side" means the gateway returned a 5xx: every line failed, no supply was available, the model was temporarily unavailable, and so on, except where the cause is one listed in section 3 (including supply-chain problems and global catastrophic events), which does not count. 4xx does not count — insufficient balance or quota, an invalid key, bad parameters, or images sent to a model without vision are problems with the request itself. A completed failover counts as a success.

  4. 2.4

    The status page publishes 90 days of daily request and failure counts per capability group, and any month can be exported as hourly counts (CSV) so you can recompute it yourself. The export contains counts only — no users, keys or request content.

  5. 2.5

    This method has three limits, and we would rather write them here than let you find them: first, a capability group with fewer than 200 requests in a month is left out, and if every group falls short that month gets no uptime figure — a handful of requests cannot vouch for a whole month, whichever way the result leans. Second, only requests that reach the gateway and get recorded are counted: if an incident is severe enough that requests never reach the gateway (an ingress outage, the whole service down), or the gateway crashes before producing a result so nothing is written, those failures do not appear in the figures. You can export the hourly counts for any month on the status page and look for a gap; if you believe the figures missed something, contact us with your own call records and once confirmed we include it in that month's review. Third, if the line fails after a streamed response has started, the request counts as a success in these figures: you receive an interruption error (`upstream_interrupted`) and a partial answer, the request is billed for what was generated (section 1.5 of the Balance and Billing Terms), and it is not counted as a request that failed on our side, so it does not lower uptime.

3What does not count as downtime

  1. 3.1

    Planned maintenance announced 72 hours ahead, up to 30 minutes cumulative per month.

  2. 3.2

    Failures originating on your side: exceeding quota, an invalid key, malformed requests, your own network.

  3. 3.3

    Failures arising from your use of a model not offered in your region (see section 4 of the Terms).

  4. 3.4

    Supply-chain problems and global catastrophic events: failures, rate limiting or withdrawal of models by model providers; global catastrophic events and force majeure, including earthquake, war, large-scale network failure, or a service suspension mandated by a regulator. Failures caused by these do not count as downtime. We still switch lines and disaster-recovery models within the capability group as usual, and a request that succeeds after a switch counts as a success.

4Failover

  1. 4.1

    When a model fails, the system automatically switches to a disaster-recovery model of equivalent capability and completes the request. Switching happens before any content reaches you: for a failure before that point, you receive a complete response from the substitute model. That includes a streamed response that has started but stalls or breaks before delivering any content (text, thinking or tool calls); the system then restarts the answer on another line of the same model within the same request. If the line fails after content has been delivered, the request cannot be switched; you receive an interruption error in the stream (`upstream_interrupted`), and what was generated is billed under section 1.5 of the Balance and Billing Terms.

  2. 4.2

    A successful failover does not count as downtime — the request succeeded. But every switch is recorded in your usage detail, naming the original model and the one actually used, so you can check.

  3. 4.3

    You can turn automatic failover off (set `failover.enabled` to `false` in a custom model policy). You cannot currently choose the substitute models or their order; the system picks them within the same capability group. With it off, a failure of your chosen model counts as downtime against this commitment (except where it falls under section 3).

  4. 4.4

    After a failover the call is billed at the multiplier of the line that actually completed it: your usage detail still names the original model and the model actually used, and where the original line's multiplier would have been cheaper the call trace shows both figures. If you do not want to be billed at another line's multiplier after a switch, you can turn automatic failover off under paragraph 4.3, or choose the "cost first" scheduling preference on your key so routing prefers cheaper lines. This paragraph applies from 29 October 2026 (Beijing time); from 2026-10-20 until then, calls were billed at the lower of the original line's multiplier (the line routing picked first for the request) and that of the line that completed them, and before 2026-10-20 at the multiplier of the line that completed them. Attempts that failed or were abandoned before the switch (including retries on the same line and duplicates sent to cut waiting time and then cancelled) are not charged to you, even where a model provider charged us for them.

5Post-mortems

  1. 5.1

    For any incident affecting more than 1% of users we publish a post-mortem within 48 hours — timeline, root cause, blast radius, remediation — signed by the person accountable.

  2. 5.2

    For any month whose uptime misses the target in section 1, we publish an availability review for that month: which capability groups missed, where the failures mainly came from, and what we changed. If you think a month's figure is wrong, export that month's hourly request counts from the status page and recompute it yourself.

  3. 5.3

    We do not write "third-party service fluctuation". Where the root cause really lies with a model provider outside our scheduling gateway, we say which dependency, why redundancy did not engage, and what we are changing.

  4. 5.4

    Every past post-mortem stays published. We do not take them down.

This is a draft, pending review by qualified counsel.